How long every job takes.
When your garage door is stuck, the first question is "how long until it works?" Here's the honest answer for every job we do, so you can plan your day before you call.
How long will my repair take? Three taps.
Typical time on site for jobs in Palm Beach County. No name or phone needed to see it.
- What's happening
- Door size
- How soon
Your repair
Typical time on site
$—
Includes:
Most calls placed before 2 PM get a same-day visit. You get a written quote before we start.
Before you book:
You picked: . Send it to us and a person answers.
Every job, timed
Time on site once we arrive. Most calls placed before 2 PM get a same-day visit, evenings and weekends included.
Garage door repair
| Job | Typical time |
|---|---|
| DiagnosisWe run and test the door by hand first | 20 – 30 min |
| Hinges and bracketsPer door | 30 – 60 min |
| Top bracket / center bearingIncludes re-balance | 45 – 90 min |
| Bottom weather sealKeeps out water, sand and lizards | 30 – 45 min |
| Balance and safety testIncluded in every repair | 15 min |
Emergency repair 24/7
| Job | Typical time |
|---|---|
| Answer and triage on the phoneCan it wait until morning? We'll tell you | 5 min |
| Arrival after hoursPalm Beach County | Usually 1 – 3 hours |
| Broken spring, after hoursFixed in the same visit | 45 – 90 min |
| Door off track, secured and re-railedFixed in the same visit | 1 – 2 hours |
| Door secured closed for the nightWhen parts must be ordered | 30 – 45 min |
Broken spring repair
| Job | Typical time |
|---|---|
| One torsion springStandard one-car door | 45 – 60 min |
| Pair of torsion springsTwo-car door, both replaced | 60 – 90 min |
| Extension springs, pairOlder doors, with safety cables | 45 – 60 min |
| Conversion: extension to torsionSafer, smoother, longer life | 2 – 3 hours |
| Spring tension adjustmentDoor drifts or slams, springs are fine | 20 – 30 min |
Broken cable repair
| Job | Typical time |
|---|---|
| Lift cables, pairBoth sides, door re-hung level | 45 – 75 min |
| Cable drums, pairGrooved or cracked drums | 45 – 60 min |
| Pulleys and safety cablesExtension-spring doors | 30 – 45 min |
| Bottom bracketsRusted or bent corner brackets | 30 – 60 min |
Door off track
| Job | Typical time |
|---|---|
| Re-rail the doorRollers back in, door secured and tested | 45 – 90 min |
| Straighten a bent track sectionWhen the steel isn't kinked | 45 – 90 min |
| Replace a vertical trackOne side, with brackets | 1.5 – 2 hours |
| Track brackets re-anchoredLoose lag bolts into block | 30 – 45 min |
Roller repair
| Job | Typical time |
|---|---|
| Nylon rollers, set of 10Sealed bearings, installed | 45 – 60 min |
| Nylon rollers, set of 14Taller or wider doors | 60 – 90 min |
| Hinges replacedCracked or worn hinges | 30 – 60 min |
| Lube and adjust onlyIf your rollers are still good | 30 – 45 min |
Panel replacement
| Job | Typical time |
|---|---|
| Measure and identify the modelFirst visit | 20 – 30 min |
| Panel orderDepends on brand and color | 1 – 3 weeks |
| Bottom panel installedHinges and rollers transferred | 1 – 1.5 hours |
| Middle or top panel installedIncludes re-balance | 1.5 – 2 hours |
| Window lite replacementOne glass or acrylic lite | 20 – 40 min |
Opener repair & installation
| Job | Typical time |
|---|---|
| Opener repairGear, sensors, logic board or limits | 45 – 90 min |
| Gear and sprocket kitChain or belt drive | 60 – 90 min |
| New belt or chain opener, installedWith battery backup and two remotes | 2 – 3 hours |
| Wall-mount (jackshaft) openerFrees the ceiling, very quiet | 3 – 4 hours |
| Remotes and keypad programmingDuring any visit | 10 – 20 min |
Remote & keypad programming
| Job | Typical time |
|---|---|
| Remote programmingEach remote | 5 – 10 min |
| Erase old remotes, re-program yoursNew homeowners | 15 min |
| Wireless keypad, installedWeather-rated, programmed | 20 – 30 min |
| Car HomeLink / built-in buttonPer car | 10 – 20 min |
| Smart / phone control kitWi-Fi hub with app | 30 – 45 min |
Safety sensor repair
| Job | Typical time |
|---|---|
| Align and testSensors fine, just out of line | 10 – 20 min |
| Sensor pair replacementBrand-matched, installed | 30 – 45 min |
| Sensor wire re-runChewed, cut or corroded wire | 45 – 60 min |
| Force and auto-reverse adjustmentSafety test included | 15 – 20 min |
Driveway gates
| Job | Typical time |
|---|---|
| Gate diagnosis and repairMost common fixes | 1 – 2 hours |
| Safety eye setAligned and tested | 45 – 60 min |
| Keypad replacementWeather-rated, programmed | 45 – 60 min |
| Battery backup replacementKeeps the gate working in outages | 20 – 30 min |
| New swing or slide gate operatorInstalled and programmed | Half a day |
New door installation
| Job | Typical time |
|---|---|
| Measure and chooseAt your home, with samples and specs | 45 – 60 min |
| Door orderDepends on model and color | 1 – 3 weeks |
| One-car door installedOld door out, tracks, springs, new door | 4 – 5 hours |
| Two-car door installedSame, plus opener check | 5 – 7 hours |
| County inspectionWe schedule it | 1 – 2 weeks after install |
Hurricane-rated doors
| Job | Typical time |
|---|---|
| Site measure and wind-zone checkYour address sets the rating | 45 – 60 min |
| Permit applicationWe pull it | 3 – 10 business days |
| Rated door orderDepends on model | 1 – 3 weeks |
| InstallationOld door out, rated door in | 5 – 8 hours |
| County inspectionWe schedule it | 1 – 2 weeks after install |
| Door Passport with approval dataBefore we leave | 10 min |
Tune-up & maintenance
| Job | Typical time |
|---|---|
| Full tune-upOne door, every point on the list | 45 – 60 min |
| Second door, same visitSame list | 30 – 40 min |
| Nylon roller upgradeIf yours are cracked or rusted | +45 min |
| Bottom weather sealKeeps out water, sand and lizards | +30 min |
What a fair quote looks like
Use this with anyone, including us.
- Written before work starts. Not "we'll see once it's open".
- Parts named and counted. "2 torsion springs, 0.250 wire", not "hardware kit".
- Labor included in the total. No separate line that appears at the end.
- Warranty in years, on paper. "Great warranty" is not a term.
- Permission to say no. Anything you'd owe for the visit is said on the phone first.
Our warranty
| What | Covered |
|---|---|
| Labor on any repair | 1 year |
| Torsion springs we install | 5 years |
| New openersPlus the manufacturer's warranty | 1 year labor |
| New doorsPlus the manufacturer's warranty | 2 years install |
| Return visit for the same problem | Included |
Most doors work again the same day.
A person in the 561 answers. Tell us what the door is doing and we'll tell you how long it takes before we come.